On a set of engineering drawings for a project on which you are…
Question Answered step-by-step On a set of engineering drawings for a project on which you are… On a set of engineering drawings for a project on which you are working (Central Supermarket), a reinforced concrete floor slab spans over a grid of steel beams spaced at 6 metres in each direction. The drawings say that the slab is 120 mm thick and has N20 bars running in two directions both top and bottom of the slab (two-way spanning and continuous). In the specifications, cover to the reinforcement is noted as 30 mm top and 20 mm bottom and the concrete strength is noted as 32 MPa. The slab is an internal slab with no external exposure. Although preparations for this stage of the job are some weeks away yet, compose two points that you wish to discuss with the engineer responsible for the design to address your concerns that there may be an error. Forward an email to your concreting subcontractor, informing them that there is an issue with the concrete slab thickness and/or concrete cover on one of the drawings, and that you are going to contact the engineer. You should inform the concreter that there may be changes to be made and that you will require a revised quote once you have received a response from the engineer. You must phone your teacher to arrange a time for a role play via a Skype/ Teams/ or other format. The role play will be a simulation of a conversation between a building contractor and an engineer. Your teacher will take on the role of the engineer, while you will take on the role of the builder responsible for this construction project. Based of this question i need to role play as a builder talking to the structural engineer about concerns i have about the concrete slab. I included all the information needed, i just need directions as to what i should address in the role play. Engineering & Technology Civil Engineering CPCCBC 4011B Share QuestionEmailCopy link Comments (0)


