Two synchronous Generators are initially supplying a common load at…

Question Answered step-by-step Two synchronous Generators are initially supplying a common load at… Two synchronous Generators are initially supplying a common load at 1.0 p.u and frequency of 50 Hz. The rating of unit 1 is 3.37 MW and has 0.03 p.u droop built into its governor unit 2 is rated at 420 MW and has 0.05 p.u droop. Find each unit share of 10% increase in load demand. Also find new-value of Line frequency. Assume free governor action. Engineering & Technology Electrical Engineering ENGINEERIN DASE Share QuestionEmailCopy link Comments (0)