The land has a suitable space where a photovoltaic (PV) power…

Question Answered step-by-step The land has a suitable space where a photovoltaic (PV) power… The land has a suitable space where a photovoltaic (PV) power system capable of generating 4 kW could be installed. The person also has a diesel-powered generator with an electrical output of 0.9 kW. The noise of the generator means that it can only be operated between the hours of 9:30 and 16:00.December have 8.5kW daily electricity con. Taking December as an example, calculate how many hours a day the generator would have to operate to provide the electrical power necessary to meet the shortfall from the solar panels. Can this be met during the permitted operating hours? Engineering & Technology Electrical Engineering ENGINEERIN T193 Share QuestionEmailCopy link Comments (0)