Orange Corporation uses a job order costing system for clients…

Question Answered step-by-step Orange Corporation uses a job order costing system for clients… Orange Corporation uses a job order costing system for clients related to custom-manufactured pulley systems. It is a wheel used to transmit power by means of a band, belt, cord, rope, or chain passing over its rim. Elmore Mechanical recently ordered 20,000 pulleys, and the job was assigned #BSAK34. Information for Job #BSAK34 revealed the following:Direct materialP40,800Direct labor49,200Manufacturing overhead (applied at 140% of DL cost)73,800Final inspection of the pulleys revealed that 230 were defective. In correcting the defects, an additional P2,500 for direct material, P9,000 for direct labor costs plus overhead rate at predetermined rate were incurred. After the defects were corrected, the pulleys were included with the other goods units and shipped to the customers. – How much of the Loss on Abnormal Rework should be recorded assuming that all rework is abnormal.  Accounting Business Cost Accounting Share QuestionEmailCopy link Comments (0)