You have now completed the on-site inspection of the condominium… You have now completed the on-site inspection of the condominium buildin

You have now completed the on-site inspection of the condominium… You have now completed the on-site inspection of the condominium building. there are no major defects detected other than the following problems that are visually noticeable:- A horizontal crack on the façade wall- Algae growth on the external wall in localized areas- Some debonding tiles and efflorescence on swimming pool tile surface leaks formbasement car part ceiling below and around pools- Peeled traffic road marking in basement carpark- Discoloration of paint work in wide spread areas(b) Examine Five (5) of the building defect above and analyse the condition of the building Engineering & Technology Industrial Engineering FEM FMT309 Share QuestionEmailCopy link